Contract Constraints
The Contract Constraints pane defines the basic scheduling parameters for each contract. Use the Constraints pane when you create a new contract when you edit an existing contract.
To view the Constraints pane for an existing contract:
- Select Policies > Contracts.
- Select an existing site in the Objects pane.
- Highlight an existing contract in the existing Contracts list.
- In the right-side pane, select Constraints.
- After you have set the parameters in the Working Hours and Working Days sections as required, in the upper right-hand corner, click Save.
Among other properties, you can set synchronization, which ensures that an agent starts each workday within a user-defined time threshold.
If you receive an error message when you are configuring Contract constraints, review the rules for each constraint (described in the Working Hours and Working Days tables below).
List of Contracts Retrieved in Segments
The list of Contracts is displayed in segments or sequential pages. When large amounts of data are being retrieved, the list of items in Contracts pane is displayed in smaller segments sequentially, with 50 items per page. This limits the number of items that are retrieved from WFM at any given time, maintaining optimal performance during retrieval. You can browse the previous and next pages or navigate to the first and last items in the data set (start and end of the list), by clicking the appropriate button in the view. To navigate between pages, you can use the Up, Down, Page Up, and Page Down keys on the keyboard.
Contract Constraints Properties
Contract Name—The name of the Contract, which must be unique within the site.
Icon—The icon you want displayed for this Contract. Choose a background color that will make identification easy. Clicking the down arrow displays all available icons.
Working Hours section
Setting Name | Definition | Daily Valid Values | Weekly Valid Values | Schedule Planning Period Valid Values |
---|---|---|---|---|
Standard Paid Hours | The paid time, in hours and minutes, that agents assigned to this contract work in a standard day, week, and (if applicable) schedule planning period. | less than 24 hours | less than 168 hours can configure with a 1-minute time unit |
less than 1008 hours (or fewer, depends on the planning period length) can configure with a 1-minute time unit |
Rules:
| ||||
Minimum Paid Hours | The minimum paid time, in hours and minutes, that agents assigned to this contract are required to work per day, week, and (if applicable) schedule planning period according to contractual requirements. | less than 24 hours | less than 168 hours can configure with a 1-minute time unit |
less than 1008 hours (or fewer, depends on the planning period length) can configure with a 1-minute time unit |
Rules:
| ||||
Maximum Paid Hours | The maximum paid time, in hours and minutes, that agents assigned to this contract are required to work per day, week, and (if applicable) schedule planning period according to contractual requirements. | less than 24 hours | less than 168 hours can configure with a 1-minute time unit |
less than 1008 hours (depends on the planning period length) can configure with a 1-minute time unit |
Rules
|
Working Days section
Setting Name | Definition | Daily Valid Values | Weekly Valid Values | Schedule Planning Period Valid Values |
---|---|---|---|---|
Maximum Consecutive Working Days | The maximum number of consecutive days that agents assigned to this contract type are allowed to work. | 1–365 days | Not Applicable | Not Applicable |
Rules:
| ||||
Minimum Working Days per Week | The minimum number of days that agents assigned to this contract must work per week. | Not Applicable | 0–7 days | Not Applicable |
Rules:
| ||||
Maximum Working Days per Week | The maximum number of days that agents assigned to this contract are allowed to work per week. | Not Applicable | 0–7 days | Not Applicable |
Rules:
|