At the top of the Contracts pane, click Site Settings to open the pane and configure the following settings for a selected site:
Minimum Duration Section
- Minimum Duration Between the End of the Day and Start of Next Working Day—Enter a time period in hours and minutes for the duration between the end of the current day and start of the next working day, or specify an unlimited duration by checking the Unlimited check box.
- Minimum Duration Between the Start Times of Two Consecutive Working Days—Enter a time period in hours and minutes for the duration between the start times of two consecutive working days, or specify an unlimited duration by checking the Unlimited check box.
Schedule Planning Period Section
- Schedule Planning Period Type—Enables you to define a period of longer than a week that can be used to set up Contract constraints, such as number of paid hours and number of days off. The Schedule Planning Period options are: None, Monthly, Two Weeks, Three Weeks, Four Weeks, Five Weeks, and Six Weeks.
- Start Date—Enter the date, on which the selected planning period begins.
After you have configured these settings, click Save .
To reconfigure these settings, you can click the Reset button. Doing so, will reinstate the default settings and the Review Validation Messages pane opens, displaying the following warning message:
If you click Reset, all settings for Schedule Planning Period work hours and time-off for all Contracts at this location will be deleted. New Schedule Planning Period settings will have to be entered manually. Do you want to continue?
Click Close if you want to ignore the message or Apply in the Review Validation Messages pane, if you want to reset the settings.